Update And Progress Report Since March 18th, Posted May 4, 2017

I am sorry that I have taken so long to post any progress reports or updates. I have been having a bad time with medical issues. For the last three months, I have been in the emergency room on the 1st, 2nd, or 3rd of each month, having been taken by ambulance each time. In March I had a kidney infection in my left kidney. In April I had a partially blocked colon. This month I have a kidney infection in my right kidney. The medication I have had to, and am still taking, leaves me very tired and not able to do very much. I will try to start back with the crochet as soon as I get over this current kidney infection.

In my post on March 18th, I had said that I would either be doing a navy blue or a black scarf. I started on the navy blue for the next scarf, but have made the decision to come back to it when I feel a lot better. The yarn is worsted and I have found it hard to work with, so I have put it away for now.

In the meantime, I was able to get some more yarn, and I made sure that it was acrylic. Acrylic yarn is so much easier to work with than worsted. The color of the scarf is charcoal. I hope to be finished with it in a few days. I am trying to work a little on it every day, but the time that I am not tired isn’t very long, so I don’t get very much done. Only time will tell when I am finally able to finish it.

Hopefully I will be over all of the medical issues, as soon as I finish taking the medicines they gave me for this last kidney infection. I will try to keep you posted better than what I did this time.